Finishes Construction on Dry Dock at Kobe Shipyard

Shozo Kawasaki had fully realized that the Company’s shipyard needed a drastic increase in capacity since Kawasaki Dockyard was established in Kobe City, Hyogo Prefecture. He planned to construct a dry dock by reclaiming land next to the shipyard. In 1892, a land survey began, and in 1895, boring tests were carried out. After the incorporation of Kawasaki Dockyard, Kojiro Matsukata pursued the plan. Construction work faced rough going due to the extremely weak foundations of the site on the Minatogawa River delta. After a couple of failures, a new technique was adopted to harden the underwater foundation by pouring concrete. Six years later in 1902, the dry dock was completed at last, costing three times as much and taking three times longer than the construction of a dock under normal conditions.

Size of the dry dock:
Length: 130 m, width: 15.7 m, depth: 5.5 m
Maximum size of ships that can be docked: 6,000 GT

The dry dock (currently No. 1 Dock, Kobe Shipyard) was listed as a Registered Tangible Cultural Asset of Japan in 1998.